Skip to content

Full bathroom · Palma and Mallorca

Bathroom renovations in Palma de Mallorca

We renovate your whole bathroom in 8 to 12 working days for €3,690 + VAT in labour. You choose the materials, so the final price is up to you, and we give you the completion date before we start.

Labour
€3,690 + VAT
Timescale
8-12 working days
Newly renovated full bathroom in a 1970s apartment in Palma's Eixample district, seen from the door

Full bathroom renovation in Palma: price, timescale and what's included

At Tecnic Project, a renovation company in Palma, labour for a full bathroom costs €3,690 + VAT and the work takes 8 to 12 working days. It includes stripping out and demolition, adapting water connections and drains, levelling, fitting the shower tray, tiling up to 22 m² of wall and 3 m² of floor, fitting the shower screen, taps, toilet, washbasin and mirror, and painting the ceiling. You choose the materials, with a 10% discount; electrics and fees are extra, and you'll see any extras in the quote before we start. We give you the start and completion dates, and the final payment comes after we've gone through the bathroom with you.

How much a bathroom renovation costs by size

The €3,690 + VAT is for a bathroom with up to 3 m² of floor and 22 m² of tiled wall. For example, a 2 × 1.5 m bathroom with a 2.5 m ceiling has about 17.5 m² of wall from floor to ceiling.

Your bathroomLabourTimescale
Up to 3 m² of floor and 22 m² of tiled wall€3,690 + VAT8 to 12 working days
More floor or more wall€3,690 + VAT plus the extra metres, quoted after measuringSet in the quote
Just replacing the bathtub with a shower tray€1,485 + VAT3 to 5 working days

Prices exclude VAT and are the same across Mallorca: with VAT, labour for a full bathroom comes to €4,059 (at 10%) or €4,464.90 (at 21%). Materials, electrics and fees are extra. Anything more your bathroom needs, you'll see in the quote before we start.

What the labour for a full bathroom includes

We take care of the building work and plumbing in the bathroom so you don't have to worry about a thing.

  • Bathroom of an old apartment in Palma currently being demolished

    Stripping out and demolition

    We remove taps, washbasin, toilet, bathtub or shower tray and accessories, and demolish the old tiling and floor.

  • Bathroom wall under construction in a Palma apartment with new hot and cold water pipes recessed in chases and the

    Water connections, drains and levelling

    We alter the water connections and drains to suit the new design, even if you move things around, and level the floor and walls.

  • Bathroom floor in a Palma apartment being renovated, newly laid with large-format light grey porcelain tiles

    Shower tray and tiling

    We fit the shower tray and lay up to 22 m² of wall tiles and 3 m² of floor tiles.

  • Fitting

    Shower screen, taps, toilet, washbasin and mirror, fitted and connected.

  • Ceiling and materials

    We paint the ceiling and deal with the materials you choose, so you don't have to.

What's extra, so you know from the start

  • Materials from well-known brands, with a 10% discount. This guide will help you: materials for renovating a bathroom.
  • Electrics: fitting spotlights, sockets, switches or the extractor fan.
  • Other work, each as its own line item: general plumbing, plasterboard, concealed cistern for a wall-hung toilet, niches, made-to-measure shower tray or screen, radiators or windows.
  • Council fees (≈ 5.3% in Palma).
  • The 3D render, if you want to see the bathroom before the work.

What sets us apart

Why choose us for your bathroom renovation in Mallorca?

With Tecnic ProjectWhat you avoid
Price€3,690 + VAT labour published, and every extra as its own line item before we start.Asking for a quote just to find out if it's within your budget.
Timescale8 to 12 working days, with start and completion dates.Being without a bathroom and not knowing for how long.
MaterialsWell-known brands, with a 10% discount and our advice.Traipsing round the shops on your own.
PermitsWe submit the prior notification; you pay the fees.The council paperwork.
Final paymentOnce we've gone through the bathroom with you and everything is right.Paying, then waiting for them to come back and finish off.

Tecnic Project is a very professional company. From the first visit to the last day of construction, they fulfilled all their commitments. They promised to renovate my bathroom in five working days, and they did! The quality of the work is excellent and the price very affordable.

Evgenia · Google review,

Small bathroom renovations in Palma

Big or small, it doesn't matter: if it's no more than 3 m² of floor and 22 m² of tiled wall, it's included in the price, and we make the most of every centimetre before you choose anything.

More ideas in what to bear in mind with a small bathroom.

  • Shower tray instead of bathtub, wall to wall if it fits.
  • Wall-hung vanity unit, which leaves the floor clear.
  • Fixed or sliding shower screen, with no doors to bump into anything.
  • Light, large-format tiles and a mirror cabinet.
Small bathroom of about 3 m² in an old apartment in Palma, newly renovated and seen from the door

How we renovate your bathroom, step by step

Someone from our team follows your bathroom throughout: materials, layout, small changes… whatever comes up. We'd rather you asked anything you like than be left with doubts.

  1. Visit and measuring up

    We measure the bathroom and check the pipework, drains and walls so we quote for what's really there. The visit has a charge, which we refund if you accept the quote.

  2. Quote and materials

    We prepare it with each extra as its own line item. You choose the materials with our advice.

  3. Dates and permits

    We give you the start and completion dates, and we submit the prior notification and, if needed, the street occupation permit.

    Start the day after the paperwork

  4. The work

    Demolition, water connections and drains, tiling and fitting. A bathroom is something you use every day, so we set a realistic schedule and stick to it.

    8 to 12 working days

  5. Final check and payment

    We go through the bathroom with you and put anything right before the final payment.

    At the end

Permits and fees for a bathroom renovation in Palma

A full bathroom goes over €3,000, so in Palma there's paperwork: if you don't touch the structure or layout, a prior notification that we submit, and work can start the next day.

The fees are in your name: 2.61% planning fee and 4% ICIO construction tax, less half of that fee. On a €6,000 job that's about €318, close to 5.3% of the construction cost.

  • Moving a partition wall to enlarge the bathroom: depending on the case, prior notification with a technician's signature and a 15-calendar-day wait.
  • Touching a load-bearing wall or opening a gap in it: building permit with a technical project.
  • Skip on the street: the permit is requested 72 working hours in advance and costs €0.41 per m² per day.
  • In an apartment, notify the residents' association first. In Palma, noisy work is only allowed on working days from 9:00 to 20:00 (from 11:00 to 19:00 between 1 May and 30 October in busy tourist areas).

Our work, your best guarantee

  • 1 + 2 year guarantee

    One year on the work and two on what's installed. And if anything comes up afterwards, we leave it perfect.

  • Financing up to 100%

    With our partner finance company, so your bathroom doesn't have to wait.

  • 10% discount on materials

    Well-known brands, not the most expensive but the ones that perform best, and advice on staying within what you want to spend.

  • Local professionals

    More than 25 years in the trade, and a site manager available by phone and WhatsApp.

Frequently asked questions about bathroom renovations in Palma

How much does a full bathroom renovation cost in Palma de Mallorca?

€3,690 + VAT in labour for a bathroom with up to 3 m² of floor and 22 m² of tiled wall, the same across Mallorca. Add the materials you choose, with a 10% discount, the fees (≈ 5.3% in Palma) and, if needed, extras such as electrics. We give you the total in writing after measuring.

What if my bathroom is bigger?

Anything over 22 m² of wall or 3 m² of floor is measured at the visit and goes in the quote as a line item. That way you know what you'll pay before we touch anything.

How long does it take to renovate a bathroom?

8 to 12 working days from demolition. We give you the dates once the materials are chosen, and we keep to them. The only thing that usually lengthens it is the delivery time of a special material.

Can I carry on living at home during the work?

Yes, if you have another bathroom: we seal off the area with plastic sheeting to reduce dust. If it's your only one, it's best to plan ahead for those 8 to 12 working days, and we take that into account when setting the dates with you.

Can I renovate the bathroom without changing all the installations?

Yes, if the plumbing and electrics are in good condition. In some renovations it's enough to renew the finishes and sanitaryware. We check at the visit and tell you what's worth changing.

What VAT applies to a bathroom renovation?

It's charged at 10% if you commission it as a private individual for your own use, the home was built or renovated more than two years ago and the materials we supply are no more than 40% of the taxable amount; otherwise, or if you rent the home out, at 21%. Labour comes to €4,059.00 or €4,464.90.

Do you renovate bathrooms outside of Palma?

Yes, across Mallorca and at the same price. We also handle the paperwork with each town council.

More bathroom work

Book your appointment to renovate your bathroom

Book an hour at our Palma office and let us guide you: we'll explain what's included in the price and what would be extra. Then we measure the bathroom at your home and give you a written quote, with the start and completion dates.